PLUTON presents a new SOTA protection and monitoring system More details
Australia |en

2007

Implementation of project on equipment supply for Chervonyi Hutir hydroelectric power plant (Kirovohradoblenergo, Ukraine): generator excitation systems — 2 units.

2013

Integration of previously supplied generators excitation systems into hydroelectric power plant monitoring and automation system.

Increasing of existing hydroelectric power plants energy efficiency is possible with application of more up-to-date equipment for control of power generation technological process. Quality of power generated by hydrogenerator depends largely on excitation control system, which should meet a number of special requirements.

Generators excitation systems are among the most critical generator components. PLUTON offered equipment is the most suitable and meets excitation systems efficiency and reliability requirements. Generators excitation system is highly reliable; its operation significantly influences generators operation stability, and correspondingly, power system in whole. Excitation system provides normal, trouble-free hydrogenerators operation at Chervonyi Hutir hydroelectric power plant.