Substations:
"Bantishevo";
"Konstantinovka";
"Fenolnoye";
"Lozovaya";
"Bliznetsy";
State enterprise "Donetsk railway"

Works performed

Supply of DC equipment packages 3.3 kV

Sites

Ingulets traction substation

Works performed

Supply of rectifier 3.3 kV for Ingulets traction substation of Pridneprovskaya railway city enterprise (Kryvyi Rih, Ukraine). Installation works, commissioning

Sites

Traction substations:
Sknyliv;
Stryi;
Regional Branch Lviv railway (Lviv, Ukraine).

Works performed

Supply of 4 DC 10 kV cubicles retrofit with replacement of circuit breaker

Sites

TS-15-10/0.4 kV Fastiv-1 station, Regional branch Southwestern Railway (Pivdenno-Zahidna Zaliznytsia) (Fastiv, Ukraine)

Works performed

Development of design and estimate documentation on step-down transformer substation reconstruction

Sites

TS-510 10/0.4 kV Kyiv-Pasazhyrskyi railway station, Regional branch Southwestern Railway (Pivdenno-Zahidna Zaliznytsia) (Kyiv)

Works performed

Development of design and estimate documentation on transformer substation reconstruction

Sites

Traction substation TS-110, 27.5/10 kV
Regional branch Southwestern Railway (Pivdenno-Zahidna Zaliznytsia)

Works performed

Development of design and estimate documentation on traction substation TS-110, 27.5/10 kV reconstruction and installation of 3.3 kV DC switchgear, Regional branch Southwestern Railway (Pivdenno-Zahidna Zaliznytsia) (Krasnohrad).

Supply of short circuit testers 3.3 kV (18 pcs.) for Regional branch Southwestern Railway (Pivdenno-Zahidna Zaliznytsia, Kharkiv).

Supply of two 3.3 kV DC contact network sectionalizing points (for 2 and 6 feeders) for Regional branch Southwestern Railway (Pivdenno-Zahidna Zaliznytsia, Kharkiv, Liubotyn).