PLUTON presents a new SOTA protection and monitoring system More details
Australia |en

Sites

CTS-43 ("Kh. Abdullayeva" station);
CTS-44 ("Badamzar" station);
CTS-46 ("A. Kodiriy" station);
CTS-48 ("Ming Urik" station)

Works performed

Supply of rectifiers — 18 units

Sites

Combined traction substation № 41 "Turkiston"

Works performed

Manufacturing and supply of equipment, installation and commissioning supervision

Sites

TS-7, TS-9, TS-11, TS-12, TS-13, TS-14

Works performed

Supply, installation supervision, commissioning.

From 1997 to 2001 PLUTON carried out supply of transformer rectifiers for 4 combined traction and step-down substations for Tashkent metro (CTS-43, CTS-44, CTS-46, CTS-48). For all the time of operation rectifiers have proven their worth by reliability, high load resistance and low maintenance. According to operating result in conditions of metro PLUTON rectifiers have got a positive evaluation from metro operational personnel.

In 2019 in Tashkent was started the implementation of project on extension of Yunusobod metro line with a total length of 2,93 km, that included building of two metro stations — Yunusobod and Turkiston. PLUTON team carried out supply of modern DC switchgears, rectifiers, transformer RESIBLOC, section boxes and distributing section boxes, DC board, charging and rectifying units VTEU, for combined traction substation № 41 "Turkiston".

In 2023, Pluton became a part of large-scale project "Construction of Kuylyuk-Kipchak-Yangi Hayot Metro Line" and successfully implemented supply of 6 traction substations (TSS-7, TSS-9, TSS-11, TSS-12, TSS-13, TSS-14). The new substations provide reliable and uninterrupted power supply to the new section of metro circle line, running overland on an overpass. The traction substations fully comply with international requirements and standards and are based on modern reliable equipment: high-efficiency rectifiers, DC switchgear, and contact network equipment (line disconnectors and cable connection devices).