PLUTON presents a new SOTA protection and monitoring system More details
Australia |en

2006

Implementation of project in supply of 2 traction substations for city electric transport in Odessa (Ukraine), installation, commissioning.

Supply package included the following PLUTON equipment:

  • rectifier — 7 units;
  • DC switchgear 600 V — 9 units;
  • auxiliary cabinet — 1 unit;
  • operational current cabinet — 1unit;
  • input unit — 1 unit.